MANILA, Philippines — President Ferdinand Marcos Jr. on Sunday visited Tuba, Benguet to inspect a rock shed project on Camp 6 in Kennon Road.
Marcos inspects rock shed project in Benguet
Accompanied by Baguio City Mayor Benjamin Magalong, Marcos again expressed his dismay after seeing that the P264-million project of the Department of Public Works and Highways (DPWH), completed in November 2024, is in “precarious condition.”

“It’s as if nothing was done,” he lamented in Filipino. “It has eroded. It eroded because the protection wall is very weak.”
“It is very low and very weak that’s why the water can seep in,” he added.
Parts of the structure’s foothold caved in when Typhoon Emong pummeled the region last July., This news data comes from:http://www.xs888999.com
- Marcos says commission on DPWH anomalies to be finalized 'very soon,' mum on Magalong participation
- Students, faculty file complaint against Universidad de Manila president
- ‘God’s Influencer’ to become first millennial saint
- Tourists dice with danger on Hanoi's train street
- Pope Leo meets LGBTQ+ Catholic advocate and vows continuity with Pope Francis' legacy of welcome
- Lacson seeks probe of 2 PH contractors' board members for conflict of interest
- Marcos sacks PNP Chief Torre, saying it was 'difficult but necessary'
- Marcos opens Hyundai's shipyard in PH
- Super Sale: Pag-IBIG offers 40% off on foreclosed assets
- Marcos willing to submit to a lifestyle check